Ce Approved Yd Double Speed Motors AC for Medical Equipment with Copper Coils

Ce Approved Yd Double Speed Motors AC for Medical Equipment with Copper Coils

Product Title:variable pace motor

 CZPT Description:
      1.YD sequence Shifting-Pole Multi-Speed Asnchronous Motor is designedon the foundation of Y sequence items. Its characteristic life in the truth that it can have phase speed change according to the differnet requirements of load so as to achieve the affordable match of electrical power nd simplify the velocity-change technique.
       two. It is anideal choice for vitality conserving. It has been broadly employed in the device device, mining location and matallurgy, textile, chemical sector and agricultural equipment.
        3.YD collection motor have defense course IP54, insulation clas of F.

Functioning Conditions:

Ambient termperature: -15°C–40°C
Altitude: Not exceeding 1000m
Rated voltage: ±5%
Rated frequency: 50Hz / 60Hz
Duty/Rating: Continuious(S1)
Insulation Class: F, the termperture rise of the stator winding is examined at 80K.
Protection Class: IP55
Cooling Method: IC411

variable pace motor CZPT Info:

Variety OUTPUT Full Load Ist/IN Tst/TN Tmax/TN
KW Speed Current Eff Energy
(r/min) (A) (%) Aspect
YD801 four .forty five 1420 1.four 66 .74 6.5 one.5 1.eight
two .fifty five 2860 one.five sixty five .85 seven one.six one.8
YD802 four .fifty five 1420 1.7 68 .74 six.five 1.5 1.8
two .seventy five 2860 two 66 .eighty five seven one.6 1.eight
YD90S 4 .eighty five 1430 two.three 74 .seventy seven 6.five 1.five 1.8
2 1.one 2850 two.eight 73 .eighty four seven 1.six one.8
YD90L 4 one.three 1430 three.three seventy six .seventy eight 6.5 1.five one.8
two 1.8 2850 4.3 74 .eighty four 7 one.six one.8
YD100L1 4 two 1430 four.eight seventy eight .81 6.5 one.5 one.8
two 2.4 2850 5.six 76 .86 7 one.six one.eight
YD100L2 4 two.4 1430 5.six seventy nine .83 six.5 1.five one.eight
2 3 2850 six.seven seventy seven .89 7 one.6 1.8
YD112M 4 3.three 1450 7.4 eighty one .eighty three six.5 1.five one.8
two four 2860 8.six 80 .88 seven one.six 1.8
YD132S 4 four.5 1450 nine.eight 83 .84 6.five 1.5 1.eight
two five.5 2860 eleven.9 79 .88 seven one.6 1.eight
YD132M four 6.five 1450 thirteen.eight eighty four .85 6.five one.5 1.eight
two eight 2880 seventeen.1 80 .89 seven 1.six 1.eight
YD160M 4 9 1460 18.5 87 .eighty five six.five 1.five one.eight
2 11 2920 22.9 eighty two .89 7 1.6 one.8
YD160L 4 11 1460 22.3 87 .86 six.5 one.5 one.8
2 fourteen 2920 28.8 eighty two .9 7 one.six 1.eight
YD180M 4 fourteen 1470 29.4 89 .87 six.five one.five one.eight
two 18.five 2940 36.seven eighty five .9 seven 1.six one.8
YD180L 4 18.5 1470 25.9 89 .88 6.five 1.5 1.eight
2 22 2940 forty two.7 86 .91 seven one.6 one.eight
YD200L four 26 1470 forty nine.9 89 .89 six.five one.4 1.eight
two thirty 2950 58.three 85 .ninety two 7 one.4 1.8
YD225S four 32 1480 60.7 90 .89 6.five one.four one.eight
2 37 2960 71.7 86 .ninety two 7 1.four 1.8
YD225M 4 37 1480 sixty nine.four ninety one .89 6.five one.4 1.8
2 45 2960 86.4 87 .92 seven one.4 1.8
YD250M 4 forty five 1480 84.four ninety one .89 six.five one.4 one.8
two 55 2960 103.two 88 .ninety two 7 1.four one.8
YD280S 4 sixty 1480 111.three ninety one .nine 6.five one.four 1.8
2 72 2970 a hundred thirty five.1 88 .ninety two seven one.4 1.8
YD280M four 72 1480 133.six 91 .nine 6.five 1.four 1.8
2 80 2970 152.two 88 .ninety three seven one.4 1.eight

 

YD90S six .sixty five 920 2.two 64 .7 6 one.four 1.eight
four .85 1420 two.three 70 .seventy nine 6.5 one.3 1.8
YD90L 6 .eighty five 930 two.eight sixty eight .seven 6 1.4 one.eight
4 one.one 1420 three 71 .79 six.five one.3 one.8
YD100L1 6 1.three 940 3.8 74 .7 6 1.4 1.8
four one.8 1440 4.four 77 .8 six.5 1.3 1.8
YD100L2 six 1.5 940 4.3 75 .seven 6 1.4 1.eight
four 2.two 1440 5.4 seventy seven .8 six.five 1.3 1.8
YD112M 6 two.two 960 5.seven 77 .seventy five 6 one.4 one.8
4 2.eight 1440 six.seven seventy seven .eighty two 6.5 1.three 1.8
YD132S six 3 960 7.7 seventy nine .7 6 one.4 one.eight
4 4 1440 9.5 80 .eighty two six.five one.3 one.8
YD132M 6 4 960 9.8 81 .76 6 1.four 1.8
four five.five 1440 12.three 80 .eighty five 6.five one.3 one.eight
YD160M 6 6.five 970 fifteen.one 84 .seventy eight six 1.4 one.eight
4 8 1460 17.4 83 .eighty five six.5 one.three one.eight
YD160L 6 9 970 twenty.6 85 .seventy eight six 1.4 one.eight
4 11 1460 23.four 84 .85 6.5 one.3 one.eight
YD180M six 11 980 25.nine eighty five .78 six one.four one.eight
4 14 1470 29.eight eighty five .85 six.five one.3 1.8
YD180L six 13 980 29.four 86 .78 6 1.4 1.eight
four sixteen 1470 33.six 85 .85 6.5 one.three one.eight
YD200L 6 18.five 980 forty one.four 87 .78 6.five one.4 1.8
4 22 1460 44.seven 87 .86 7 one.three one.8
YD225S six 22 980 44.2 88 .86 six.5 1.four one.eight
four 28 1470 fifty six.two 87 .87 7 1.3 1.eight
YD225M six 26 980 fifty two.2 88 .86 six.5 one.4 one.8
four 34 1470 66 87 .9 seven 1.three one.eight
YD250M 6 32 980 62.1 90 .87 six.five one.four 1.eight
4 42 1470 74.7 88 .ninety one 7 1.3 one.8
YD280S 6 forty two 980 eighty one.five ninety .87 six.five one.four 1.eight
4 55 1470 104.2 89 .9 seven 1.three 1.eight
YD280M six 55 990 106.seven 90 .87 six.5 1.four 1.eight
4 seventy two 1480 138.one 89 .89 7 one.three one.8
YD90L eight .forty five 680 one.nine 58 .sixty three 5.5 one.five one.8
four .75 1420 one.92 seventy two .87 six.5 one.5 1.eight
YD100L 8 .eighty five seven-hundred three.1 sixty eight .63 five.5 one.5 1.8
four 1.5 1420 three.five seventy five .88 6.five one.five one.8
YD112M eight one.five 700 five 72 .63 5.five one.five one.eight
4 two.four 1420 5.three 78 .88 six.5 one.five one.eight
YD132S 8 two.two 720 seven seventy five .sixty four five.5 1.five 1.8
4 3.3 1440 seven.one eighty .88 six.5 one.5 one.8

Our Production: 

Our Packing and Loading: 

FAQ:
Q: Do you offer you OEM services?
A: Indeed.

Q: What is your payment terms?
A: thirty% T/T as deposit in advance, 70% equilibrium right after receipt of the copy of B/L or just before cargo.
    Also we do L/C at sight, D/P, West Union, Funds Gram and so on.

Q: What is your direct time?
A: About 5-10 doing work times for LCL cargo purchase and about 20days for container order following receipt the deposit or unique irrevocable L/C.

Q: What certifiicate do you have?
A: We have CE, ISO, SASO. And we can utilize for distinct certificates for diverse nations desire. 

Q:How lengthy is your products warranty?
 A: 12months quality assure.
     If the motor is ruined or can not perform generally because of to the production problems, our company will fix and substitute the spare components or complete motors by free of charge of cost.

Why Us?
a. Factory Charges — with advanced lamination,casting,rotor pouring, winding, painting, testing and packing machines, all of significant materials are developed by ourselves which saved the manufacturing price a lot which offers clientele much more profits to resell or distribute.

b.Guaranteed Quality — Perfect physical appearance, minimal sounds, no heating also slight vibration can make substantial good quality goods. Also we do a hundred% new material,a hundred% cooper wire,one hundred% power, a hundred% analyzed qualified just before cargo.

c.Specialist Services — Inside of 12hours to reply you all inquiries and queries, also much seasoned revenue can provide you very good solutions and cooperate with you quite nicely on each before and soon after sale.

Welcome to speak to with us !

Ce Approved Yd Double Speed Motors AC for Medical Equipment with Copper Coils